Let’s Find the Right Shower Door for You

 

At The Shower Door Place our most valuable design resource is our two showrooms located in Roseville and Minnetonka. The best way to learn about what we do is to visit one of our showrooms and talk with one of our sales consultants.  Each customer has different needs depending on where they are in their project phase. Our knowledgeable staff will coach you through the process and answer any questions you may have.

The Shower Door Place Design Experience

1. Before you arrive to the showroom:

  • Take a few minutes to measure your shower so that we will have the best possible information to work from. 

  • Take a few photos of your current shower space to show us when you visit the showroom. The more pictures you have, both in detail and of the full room, the better!

2. Now that you are here:

The first step in your visit will be narrowing down the options and finding the solution that will be optimal for your shower configuration.  Our sales staff will ask you a number of things about the layout of your shower, including:

  • Dimensions - based on your at home measurements

  • Unique features of your bathroom space that might affect the function of your shower door

  • Glass preferences, hardware finishes, handles and additional accessory choices. 

3. We will come to you:

If your shower is ready for glass, we can schedule an in-home measurement appointment.  This appointment is critical to getting the exact dimensions, including out of square dimensions for all surfaces where the glass will reside. 

Please note that we cannot measure until all surfaces (tile, quartz, granite, fiberglass, curbs and walls) are permanently installed.

4. Final step:

Once your measurements are completed your salesperson will create a virtual bid that will be emailed or texted to you.  This bid can easily be accepted online when you are ready to order.  We only require a 50% deposit to order your glass, with the other half being due upon completion of the work. 

5. Sit back and wait:

A typical lead time from order placement to final installation is 4-6 weeks, but this varies depending on a number of factors such as glass and hardware lead times, volume of jobs in our system, and customer availability.

Our goal throughout this entire process is to make it as easy an enjoyable as possible to solve your shower door problem. Each customer has different needs, depending on where they are in their project phase, so our knowledgeable staff will coach you through the process to make sure you understand the end result as closely as possible. We look forward to helping you!